Title | SAN FRANCISCO INTERNATIONAL AIRPORT LONG TERM PARKING GARAGE NO. 2 PROJECT (TRADE PACKAGES 4B, 4D & 5Q) |
---|---|
Bid Date | 10/21/2016 |
Description | The proposed LTPG2 is a 6 story parking structure which will be located northwest of the existing Long Term Parking Garage 1 (LTPG1) on Lot DD, at the northwest corner of Lot DD adjacent to the intersection of South Airport Boulevard and Highway 380. The total square footage of the new facility is approximately 1,300,000 square feet. Nibbi Brothers is currently prequalifying subcontractors for the Plumbing, HVAC, and Photovoltaic Panel trade packages. |
Upload Ads | |
Click link to view image: | SFO-Long-Term-Garage-2-Pkgs-4B-4D-5Q-9-28-16.pdf |
Contractor | Nibbi Brothers |
Description | Nibbi Brothers has been selected as the General Contractor for the new Long Term Parking Garage No. 2 (LTPG2) Project at SFO. The proposed LTPG2 is a 6 story parking structure which will be located northwest of the existing Long Term Parking Garage 1 (LTPG1) on Lot DD, at the northwest corner of Lot DD adjacent to the intersection of South Airport Boulevard and Highway 380. The total square footage of the new facility is approximately 1,300,000 square feet. Nibbi Brothers is currently prequalifying subcontractors for the following packages: TRADE PACKAGES: PRE-QUALIFICATION DUE DATE FOR ABOVE PACKAGES: To obtain bid documents, please contact Kira Feuz by email at: kiraf@nibbi.com or call (415) 863-1820, ext 130. For specific questions regarding this project, please contact Noe Valenzuela, Preconstruction Project Manager, at: noev@nibbi.com or call (415) 863-1820, ext 126. Click on link to open Advertisement for more full details. |