Title | SAN FRANCISCO COMMUNITY SCHOOL LIBRARY AND OFFICE BUILDING |
---|---|
Bid Date | 03/21/2018 |
Description | The Project is generally described as construction of a new library and office building using a prefabricated modular building system that will fulfill proposed design intent of the project. The Project consists of the demolition of an existing portable building which includes a restroom and adjacent sidewalk retaining walls. The Project also includes earthwork, excavation and backfill, and construction of a custom concrete foundation and sidewalk retaining wall which will replace a portion of an existing retaining wall, along with the utility hookups for the prefabricated modular building that include electrical power, water, sewer, data, phone, fire alarm, and other site improvements. The selected contractor shall coordinate the completion of the foundation with the building manufacturer of the modular building with regard to the arrival and installation of the building units unto the custom foundation. Site grading, paving and drainage and new fencing are included. Some hazardous materials abatement is also involved. |
Upload Ads | |
Click link to view image: | SFCommunitySchool-3-13-18.pdf |
Contractor | Eternal Construction, Inc. |
Description | ETERNAL CONSTRUCTION, INC. is requesting Sub-Bids on "ALL TRADES" from all qualified Subcontractors and Suppliers, including DVBE, MBE, LBE & WBE firms for the following project: San Francisco Community School Library and Office Building (Project #11836) located at 125 Excelsior Ave, San Francisco, CA 94112. BIDS ARE DUE NO LATER THAN MARCH 21, 2018, at 2PM. Contact Jack Ng at (650) 692-6638, or by email at: jackng@eternalconst.com with any questions. SUBMIT & FAX all proposals to (650) 692-6686. Click on above link to view Advertisement for more details. |