Title | CLAIRE LILIENTHAL (SCOTT CAMPUS) 3-8 SCHOOL - NEW CLASSROOM & GYMNASIUM BUILDING & 2018 INTERIM HOUSING RELOCATABLES (PROJECT #11852) |
---|---|
Bid Date | 04/09/2018 |
Description | The Project is generally described as: b. Installation of 5 relocatable classroom buildings as interim housing which includes accessible metal ramps and transition landings, electrical services, fire alarm and data systems, security systems, improvements to ADA path of travel, fencing, accessible gates. (Procurement of relocatable classroom buildings under separate contract.) Estimated Construction Value: $12,500,000 |
Upload Ads | |
Click link to view image: | Claire-Lilienthal-3-26-181.pdf |
Contractor | Arntz Builders, Inc. |
Description | ARNTZ BUILDERS, INC., an Equal Opportunity Employer, requests quotations from ALL qualified Subcontractors and Suppliers, including State of California DGS Certified DVBE Subcontractors and Suppliers for ALL TRADES for the Project known as: CLAIRE LILIENTHAL (SCOTT CAMPUS) 3-8 SCHOOL - NEW CLASSROOM & GYMNASIUM BUILDING AND 2018 INTERIM HOUSING RELOCATABLES (Project #11852) located at 3630 Divisadero St., San Francisco, CA 94123. BIDS ARE DUE NO LATER THAN April 9, 2018, at 2 PM. Trades needed, but not limited to, Haz Mat, Haz Soil, Site Demo, Grading and Paving, Site Utilities, Drilled Piles, Structural Concrete, Rebar, Site Concrete, Landscape & Irrigation, Electrical, Structural Steel & Misc. Metals, Decorative Fences & Gates, Chainlink Fences & Gates, Metal Deck, Self-Adhering Waterproofing, Weather Barriers, Building Insulation, Thermoplastic Roofing, Wood Athletic Flooring, Resilient Flooring, Resinous Flooring, Vapor Emissions, Casework, Plastic Paneling, Painting, Metal Studs & Drywall, Stucco, Rigid Insulation Sheathing, Fabric Wrapped Panels, Fiber Cement Siding, Ceramic Tile, Fabricated Sound & Vibration Assemblies, Fixed Sound-Absorptive Panels, Acoustical Ceilings, Linear Metal Ceiling, Hollow Metal, Wood Doors, Plastic Doors, Hardware, Installation, Aluminum, Storefronts, Curtain Walls & Aluminum Windows, Fabricated Faced Panel Assemblies, Automatic Door Operators, Overhead Doors, HVAC, Plumbing, Fire Sprinklers, Sheet Metal Flashings, Joint Sealants, Roof Hatches, Access Doors, Tubular Skylights, Signage, Toilet Compartment, Toilet Accessories, Fire Extinguishers and Cabinets, Projection Screens, Blinds & Shades. Arntz Builders is signatory to the Carpenter's and Laborer's Collective Bargaining Agreements. Questions should be directed to Kelsey Godfrey at (415) 382-1188, or by email at: bid@arntzbuilders.com. BIDS SHOULD BE FAXED TO (415) 883-7529. Click on above link to view Advertisement for more details. |
Click link to view image: | Claire-Lilienthal-3-26-18.pdf |
Contractor | Zolman Construction & Development, Inc. |
Description | ZOLMAN CONSTRUCTION & DEVELOPMENT, INC., (Signatory to the Carpenters & Laborers Union) as a "GENERAL CONTRACTOR" is requesting quotations on "ALL TRADES" from all qualified Subcontractors and Suppliers, including DVBE, LBE, DBE, SBE, MBE, WBE firms for the following project: CLAIRE LILIENTHAL (SCOTT CAMPUS) 3-8 SCHOOL - NEW CLASSROOM & GYMNASIUM BUILDING AND 2018 INTERIM HOUSING RELOCATABLES (Project #11852) located at 3630 Divisadero St., San Francisco, CA 94123. BIDS ARE DUE NO LATER THAN APRIL 9, 2018, AT 2PM. Contact Milu Magsombol at (650) 802-9901 with any questions. All Bidders are hereby notified that the District has a Project Labor Agreement (PLA) in effect on this Project and all contractors and subcontractors bidding this project will be required to comply with the PLA. SUBMIT & FAX all proposals to (650) 802-9902. Click on above link to view Advertisement for more details. |
Click link to view image: | Claire-Lienthal-3-26-18.pdf |
Contractor | Thompson Builders Corporation |
Description | THOMPSON BUILDERS CORPORATION, an Equal Opportunity Employer, as a "General Contractor" is requesting bids from ALL Subcontractors, Suppliers and Truckers for the project known as: CLAIRE LILIENTHAL (SCOTT CAMPUS) 3-8 SCHOOL - NEW CLASSROOM & GYMNASIUM BUILDING AND 2018 INTERIM HOUSING RELOCATABLES (Project #11852) located at 3630 Divisadero St., San Francisco, CA 94123. Bids are due no later than April 9, 2018, at 2PM. PLEASE NOTE: THOMPSON BUILDERS IS REQUESTING BIDS BY NOON ON APRIL 9TH (BID DAY). Thompson Builders Corporation is signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers’ Compensation are required. A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors’ faithful performance and payment bonds in the amount of the subcontract price may be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation. TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Their estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. Contact Dalia Nieto at (415) 456-8972 with any questions. Dalia may also be contacted by email at: dalian@tbcorp.com. BIDS SHOULD BE FAXED TO (415) 459-0665. Click on above link to view Advertisement for more project details. |