Title | 22 FILLMORE TRANSIT PRIORITY PROJECT - SFMTA (REBID) |
---|---|
Bid Date | 06/07/2018 |
Description | The scope of the 22 Fillmore Transit Priority Project includes rerouting the 22 Fillmore transit line from Potrero Hill such that it continues along 16th Street and terminates at Mission Bay. To facilitate this reroute, new Overhead Contact System (OCS) infrastructure and traction power ductbank will be installed. In addition, transit bulbs and transit boarding islands will be constructed to enable more efficient passenger boarding and alighting. Pedestrian bulbs, raised crosswalks, and curb ramps will be constructed to enhance pedestrian safety. Traffic signals and traffic signal communication infrastructure will also be added or upgraded. Other project scope includes streetscape, streetlight, and roadway rehabilitation improvements. In order to provide minimal overall disruption to the public, the 22 Fillmore Transit Priority Project will incorporate other planned projects on 16th Street. The San Francisco Public Utilities Commission (SFPUC) has incorporated its water and sewer main replacement scope in this Projects. The above description of the Work is a general summary only and does not modify the requirements set out in the Specifications, Drawings or other Contract Documents. Engineer's Estimate: $34,800,000 |
Upload Ads | |
Click link to view image: | 22-Fillmore-Transit-5-29-18.pdf |
Contractor | Mitchell Engineering |
Description | Mitchell Engineering, an Equal Opportunity Employer, is requesting bids from ALL qualified Subcontractors, Truckers, and Material/Equipment Suppliers, including ALL QUALIFIED AND/OR CERTIFIED San Francisco LBE Subcontractors, Truckers, and Material/Equipment Suppliers in the format of the bid form for the following trades: Trucking/Hauling/Hazardous Waste Disposal; SWPPP; Survey; Traffic Control; Welding; Electrical; Communication & Fiber Optic Sub & Material; Instrumentation Sub/ Equip & Supplies; Street Lighting & Traffic Signals; Rail Procurement; Ductbank Manholes & Utility Boxes; Valves & Fittings; Overhead Contact System; Overhead Contact System Spare Parts; Manholes; Concrete including Curb & Gutter; Television Inspections; Signs; Manholes; Saw Cutting; Trolley Wire; PVC Materials; Tree Protection & Tree Removal; Landscaping with Irrigation; Tree's with Staking; Concrete Milling for the following Project: 22 FILLMORE TRANSIT PRIORTIY (Contract #1303R) located in San Francisco, CA. Bids are due no later than June 7, 2018, at 3PM. PLEASE NOTE: MITCHELL ENGINEERING IS REQUESTING BIDS BY 1PM ON JUNE 7, 2018 IN ORDER FOR BIDS TO BE CONSIDERED. Please respond with an email with your intent to bid this Project. All questions are welcomed. Please contact Don Hart at (415) 589-7311, or by email at: dhart@mitchell-engineering.com OR Kathy Streblow at (415) 227-1040, or by email at: kstreblow@mitchell-engineering.com. BIDS SHOULD BE FAXED TO (415) 227-1049 or (415) 227-1046. Click on above link to view Advertisement for more details. |