Title | 8-INCH DUCTILE IRON WATER MAIN REPLACEMENT ON GREEN STREET FROM GOUGH STREET TO BRODERICK STREET |
---|---|
Bid Date | 12/20/2018 |
Description | The objective of the Project is to provide redundancy to the aging pipelines of San Francisco's water distribution system. The Work to be performed under this Contract includes the installation of a new 8" ductile iron pipe on Green St. from Gough St to Broderick St. The Work is to be performed in San Francisco, California. Engineer's Estimate: $4,300,000 |
Upload Ads | |
Click link to view image: | Ductile-Main-Green-St-12-7-18.pdf |
Contractor | Mitchell Engineering |
Description | Mitchell Engineering, an Equal Opportunity Employer, is requesting bids from all qualified Subcontractors, Truckers, and Material/Equipment Suppliers, including ALL QUALIFIED AND/OR CERTIFIED San Francisco LBE Subcontractors, Truckers, and Material/Equipment Suppliers in the format of the bid form for the following trades: Traffic Control; Concrete Work; Sidewalks/Gutters/Curb Ramps; Grading & Paving & Asphalt Concrete Filling; Electrical; Trucking; Saw Cutting; SWPPP; Survey; Stripping; Valve Box Casting; Concrete Manhole/Frame/Cover; Piping 4-6-8" Ductile Iron Tyton Joint Pipe; Meter Boxes; Gate Valve & Air Valve for the following Project: 8-INCH DUCTILE IRON WATER MAIN REPLACEMENT ON GREEN STREET FROM GOUGH STREET TO BRODERICK STREET (Contract #WD-2614) located in San Francisco, CA. Bids are due no later than December 20, 2018, at 2 PM. PLEASE NOTE: Mitchell Engineering is requesting bids by NOON ON BID DAY (DECEMBER 20, 2018) in order for bids to be considered. Please respond with an email with your intent to bid this Project. All questions are welcomed. Please contact Don Hart at (415) 589-7311, or by email at: dhart@mitchell-engineering.com OR Kathy Streblow at (415) 227-1040, or by email at: kstreblow@mitchell-engineering.com. BIDS SHOULD BE FAXED TO (415) 227-1049 or (415) 227-1046. Click on above link to view Advertisement for more details. |