Title | SAN FRANCISCO WESTSIDE RECYCLED WATER PUMP STATION AND RESERVOIR |
---|---|
Bid Date | 02/14/2019 |
Description | The objective of the Project to construct a new underground 840,000-gallon reinforced concrete reservoir and above-ground pump station within Golden Gate Park, adjacent to the existing GGP Central Pump Station site. The new recycled water pump station will include four (4) 100 horsepower pumps (3 duty + 1 standby), two (2) 8,500-gallon hydropneumatic tanks, associated pipeline, valves, ventilation, and electrical and instrumentation & controls systems. The new recycled water pump station and reservoir will serve Lincoln Park and the Presidio. Engineer's Estimate: $20,000,000 |
Upload Ads | |
Click link to view image: | SF-Westside-Recycled-Pump-Station-1-14-19.pdf |
Contractor | Mitchell Engineering |
Description | Mitchell Engineering, an Equal Opportunity Employer, is requesting bids from all qualified Subcontractors, Truckers, and Material/Equipment Suppliers, including ALL QUALIFIED AND/OR CERTIFIED San Francisco LBE Subcontractors, Truckers, and Material/Equipment Suppliers. San Francisco LBE Subcontracting Participation requirement is 17% and ONLY San Francisco (Local) Small & Micro-LBE's can be utilized to meet this requirement (Firms certified by SF Contract Monitoring Division). Mitchell Engineering is also encouraging DBE's and SBE'sfor this Contract and has posted their AD 30 days in advance of the bid date requesting DBE's also participate in the San Francisco Westside Recycled Water Pump Station and Reservoir (Contract #WD-2797). Mitchell Engineering request Subcontractor/Vendors and Trucking proposals in the format of the bid form for the following trades: Traffic Control; Reinforced Concrete(Shotcrete); Electrical; Structural Steel; Trucking; Piping; SWPPP; Survey; Landscape; Valves; Removable Skylight System; Security Fence and Gate; Cored Drill Holes on Existing Reservoir; Piping; Cathodic Protection System; Pumps; Excavation Support & Protection (sheeting and Shoring); I&C Work for New RW Pump Station; Hydropneumatic Tanks and Compressed Air System; Testing of Existing Lincoln Park and Presidio Revenue Flowmeters for the following Project: SAN FRANCISCO WESTSIDE RECYCLED WATER PUMP STATION AND RESERVOIR (Contract #WD-2797) located in San Francisco, CA. Bids are due no later than February 14, 2019, at 2 PM. PLEASE NOTE: Mitchell Engineering is requesting bids by NOON ON BID DAY (FEBRUARY 14, 2019) in order for bids to be considered. Please respond with an email with your intent to bid this Project. All questions are welcomed. Please contact Don Hart at (415) 589-7311, or by email at: dhart@mitchell-engineering.com OR Kathy Streblow at (415) 227-1040, or by email at: kstreblow@mitchell-engineering.com. BIDS SHOULD BE FAXED TO (415) 227-1049 or (415) 227-1046. Click on above link to view Advertisement for more details. |