Skip to main content
TitleWEST CAMPUS IMPROVEMENTS TO BUILDINGS A, B, E AND G INCREMENT #1
Bid Date04/16/2019
Description

The Project consists of, but not limited to, the following:

Improve campus conditions with new play yards, building systems, accessible access and refreshed finishes to buildings A, B, E and G.

Building A: converting the band room into a library/study by providing building M, E, P and Telcom Systems, finishes and a fully accessible path of travel. Other work in Building A includes interior painting, security upgrades and restroom lavatory height adjustments.

Building B: scope includes new M, E, P, AV, Telcom Building Systems and theatrical production systems, renovated restrooms, restored finishes, accessible seating and paths of travel from point of entry to viewing positions, to stage and performer accessible path to and from stage.

Building E: scope includes interior painting, security, upgrades, and restroom lavatory height adjustments.

Building G: scope includes converting the second floor gym into a lunch room and server for food prepared off-site. No change in occupancy type. Includes new building M, E, P, Telcom Building Systems, minor interior modifications, new finishes, and server equipment.

First floor includes new accessible student restrooms, M, E, P Building Systems Equipment, Exterior Doors and Security Upgrades. No change in occupancy type.

Site: landscape scope includes new playground and structures within courtyard area and refreshed asphalt hardscape with play courts. Revised grades for accessible path of travel and storm water drainage. Also, new exterior lighting.

Please note: Prequalified Contractors Only.

Upload Ads
Click link to view image:Berkeley-West-Campus-4-8-19.pdf
ContractorArntz Builders, Inc.
Description

ARNTZ BUILDERS, INC., an Equal Opportunity Employer, requests quotations from ALL qualified Subcontractors and Suppliers, including State of California DGS Certified DVBE Subcontractors and Suppliers for ALL TRADES for the Project known as: WEST CAMPUS IMPROVEMENTS TO BUILDINGS A, B, E AND G INCREMENT #1 located at 1222 University Ave, Berkeley, CA 94702. BIDS ARE DUE NO LATER THAN APRIL 16, 2019, at 2 PM.

Trades needed, but not limited to: Tree Protection, Selective Demolition, Concrete, Brick Masonry, Steel Decking, Metal Fabrications, Casework, Roof Repair, Sheet Metal Flashing and Trim, Firestopping, Joint Sealants, Hollow Metal Door and Frames, Coiling Counter Doors, Door Hardware, Glazing, Gypboard, Acoustical Panel Ceilings, Resilient Flooring, Tile Carpeting, Insulation, Painting, Visual Display Surfaces, Signage, Toilet Compartments and Accessories, Metal Lockers, Food Service Equipment, Wheelchair Lifts, Plumbing, HVAC, Electrical, Earthwork, Site Furnishings, Plants, Landscape Stone, Storm Drainage.

Questions should be directed to Kelsey Godfrey at (415) 382-1188, or by email at: bid@arntzbuilders.com. BIDS SHOULD BE FAXED TO (415) 883-7529. Click on above link to view Advertisement for more details.

Arntz Builders is signatory to the Carpenter's and Laborer's Collective Bargaining Agreements.