Skip to main content
TitleROOSEVELT ELEMENTARY SCHOOL ASPHALT REPLACEMENT
Bid Date10/22/2019
Description

Roosevelt Elementary School Asphalt Replacement 2. The Project consists of: Remove existing 3" section of AC and lime treat native soil then install new 3" section of 3/4 " CalTrans Asphalt Concrete mix. Restripe AC surface to match existing condition.

Engineer's Estimate: $250,000

Upload Ads
Click link to view image:Roosevelt-ES-Asphalt-Replace-10-10-19.pdf
ContractorDRYCO Construction, Inc.
Description

DRYCO CONSTRUCTION, INC. is requesting quotes from ALL qualified Subcontractors and Suppliers, including quotes from Certified DVBE Subcontractors and Suppliers for the Project known as: ROOSEVELT ELEMENTARY SCHOOL ASPHALT REPLACEMENT (Bid #19092700) located at 2223 Vera Avenue, Redwood City, CA 94061. BIDS ARE DUE NO LATER THAN OCTOBER 22, 2019, at 2 PM.

Seeking Bids For: Lime/Cement Treat, and Trucking.

Questions should be directed to Tyler Carr at (510) 513-1810 Cell. You may also contact Kelley Heimsoth, Project Coordinator, at the Main Office at (510) 438-6500, or by email at: KelleyH@DRYCO.com. BIDS SHOULD BE FAXED TO (510) 438-6510. Click on above link to view Advertisement for more details.