Skip to main content
TitleTULE ELK PARK EARLY EDUCATION SCHOOL MODERNIZATION
Bid Date11/19/2019
Description

General School Modernization and reconstruction including, but not limited to: Demolition, Hazmat, ADA Access, Seismic Upgrades, and Fire/Life-Safety upgrades, and seismic upgrade. Complete renovation of existing two-story building and existing one-story building. Temporary weather enclosure shrink wrap, temporary roofing, and scaffolding. Renovations include new mechanical, electrical, and low voltage systems, new plumbing and fire sprinkler systems, new partitions, windows, doors, casework, and all new finishes both interior and exterior, and new roofing. Site work including ADA path of travel upgrades and related paving, planting and irrigation, new PG&E service, fencing and gates, freestanding canopy structure, site walls and curbs, and site utilities including points of connection in the public right of way.

Previous work included selective demolition of some existing finishes, partitions, utilities, fixtures, and hazmat abatement. No structural demolition was performed.

Estimated Construction Value: $11,500,000

Upload Ads
Click link to view image:Tule-Elk-Park-Early-Ed-School-10-29-19.pdf
ContractorWickman Development & Construction
Description

WICKMAN DEVELOPMENT & CONSTRUCTION, as a General Contractor, requests sub-bids on ALL TRADES from all qualified Subcontractors and Suppliers, including certified DVBE/LBE/DBE/SBE/MBE/WBE Subcontractors and Suppliers for the Project known as: TULE ELK PARK EARLY EDUCATION SCHOOL MODERNIZATION (SFUSD PROJECT #11904) located at 2110 Greenwich St., San Francisco, CA 94123. Bids are due no later than Tuesday, November 19, 2019, at 2 PM.

PLEASE NOTE: BIDS ARE DUE TO WICKMAN DEVELOPMENT & CONSTRUCTION BY 10AM ON TUESDAY, NOVEMBER 19, 2019.

Union Affiliations: Wickman Development and Construction is signatory to the Carpenter’s and Laborer’s Unions of Northern California Master Agreement. All sub-contractors who intend to bid scopes of work to Wickman Development and Construction that fall under the Master Agreement of these unions must also be signatory to these unions or we cannot list them for that portion of work.

Questions should be directed to Jonathan D. Wickman by calling (415) 239-4500, or by email to: jonathan@wickmandev.com

BIDS SHOULD BE EMAILED TO: jonathan@wickmandev.com OR FAXED TO (415) 239-4511. Click on above link to view Advertisement for more details.

Click link to view image:Tule-Elk-Park-10-31-19.pdf
ContractorFine Line Construction
Description

FINE LINE CONSTRUCTION, an Equal Opportunity Employer, requests quotations from ALL qualified Subcontractors and Suppliers, including certified DVBE/LBE/DBE/SBE/MBE/WBE firms for the Project known as: TULE ELK PARK EARLY EDUCATION SCHOOL MODERNIZATION (SFUSD PROJECT #11904) located at 2110 Greenwich St., San Francisco, CA 94123. Bids are due no later than Tuesday, November 19, 2019, at 2 PM.

PLEASE NOTE: SUB BIDS ARE DUE TO FINELINE CONSTRUCTION BY 2 PM ON MONDAY, NOVEMBER 18, 2019 IN ORDER FOR BIDS TO BE CONSIDERED.

Trades Needed (but not limited to see spec sections under division titles): Existing Conditions; Concrete; Metals; Wood, Plastics, And Composites; Thermal And Moisture Protection; Openings; Finishes; Specialties; Equipment; Furnishings; Conveying Equipment; Fire Suppression; Plumbing; HVAC; Integrated Automation; Electrical; Communications; Electronic Safety And Security; Earthwork; Exterior Improvements; Utilities; Hazardous Material Abatement.

SUBMIT PROPOSALS BY EMAIL TO: cmollring@finelineconst.com OR FAX TO: (415) 512-7688. Questions should be directed to Carrie Mollring at (415) 512-7677. Click on above link to view Advertisement for more details.

Click link to view image:Tule-Elk-Park-11-1-19.pdf
ContractorArntz Builders, Inc.
Description

ARNTZ BUILDERS, INC., an Equal Opportunity Employer, requests quotations from ALL qualified Subcontractors and Suppliers, including State of California DGS Certified DVBE Subcontractors and Suppliers for ALL TRADES for the Project known as: TULE ELK PARK EARLY EDUCATION SCHOOL MODERNIZATION (SFUSD PROJECT #11904) located at 2110 Greenwich St., San Francisco, CA 94123. BIDS ARE DUE NO LATER THAN TUESDAY, NOVEMBER 19, 2019, AT 2 PM.

Trades needed, but not limited to: Tree Protection, Selective Structure Demo, Concrete, Reinforcing Steel, Shotcrete, Post Installed Anchors, Structural Steel and Miscellaneous Iron, Metal Fabrication, Finish Carpentry Restoration, Rough Carpentry Landscape Wood Structures, Architectural Woodwork, Building Insulation, Roof Insulation, Modified Bitumen Roofing, Sheet Metal Flashing and Trim, Firestopping, Hollow Metal Doors and Frames, Wood Doors, Access Doors, Coiling Counter Doors, Aluminum-Framed Entrances and Storefronts, Aluminum-Framed Folding Doors, Aluminum Windows, Door Hardware, Glass & Glazing, Metal Framing, Gypsum Board, Ceramic Tile, Acoustical Tile Ceilings, Resilient Flooring, Resinous Epoxy Flooring, Painting, Visual Display Surfaces, Signage, Toilet Compartments & Accessories, Metal Storage Shelving, Flagpoles, Bird Control, Residential Appliances, Roller Window Shades, Entrance Floor Mats, Hydraulic Elevator, Fire Suppression, Plumbing, HVAC, Electrical, Earthwork, Drilled Piers, Concrete Paving, Chain Link Fences, Site Furnishings, Planting Irrigation, Site Utilities, Hazmat.

SUBMIT PROPOSALS BY EMAIL TO: bid@arntzbuilders.com OR FAX TO: (415) 883-7529. Questions should be directed to Kelsey Godfrey at (415) 382-1188. Click on above link to view Advertisement for more details.

Arntz Builders is signatory to the Carpenter's and Laborer's Collective Bargaining Agreements.

Click link to view image:Tule-Elk-Park-11-1-191.pdf
ContractorJUV, Inc.
Description

JUV, INC., an Equal Opportunity Employer, is inviting bids from all qualified Subcontractors and Suppliers, including certified and qualified DVBE/LBE/MBE/WBE/DBE/SBE firms for ALL trades Project known as: TULE ELK PARK EARLY EDUCATION SCHOOL MODERNIZATION (SFUSD PROJECT #11904) located at 2110 Greenwich St., San Francisco, CA 94123. General Contractor bids are due to Owner no later than Tuesday, November 19, 2019, at 2 PM.

PLEASE NOTE: SUB BIDS ARE DUE TO JUV, INC. BY 2 PM ON MONDAY, NOVEMBER 18, 2019 IN ORDER FOR BIDS TO BE CONSIDERED.

SUBMIT PROPOSALS BY EMAIL TO: juv@juvinc.com OR FAX TO: (510) 777-9203. Questions should be directed to Vladimir Chernyavskiy at (510) 836-1300. Click on above link to view Advertisement for more details.

Click link to view image:Tule-Elk-Park-11-5-19.pdf
ContractorBana Builders & Glass, Inc.
Description

BANA BUILDERS & GLASS, INC. as a "GENERAL CONTRACTOR" is requesting quotations on "ALL TRADES" from all qualified Subcontractors and Suppliers, including certified DVBE, LBE, DBE, SBE, MBE, WBE firms for the following project: TULE ELK PARK EARLY EDUCATION SCHOOL MODERNIZATION (SFUSD PROJECT #11904) located at 2110 Greenwich St., San Francisco, CA 94123. BIDS ARE DUE NO LATER THAN TUESDAY, NOVEMBER 19, 2019, AT 2 PM.

PLEASE NOTE: All Bidders are hereby notified that the District has a Project Labor Agreement (PLA) in effect on this Project and all contractors and subcontractors bidding this project will be required to comply with the PLA.

Contact Jesse Verzano at (415) 298-3189 with any questions.

SUBMIT PROPOSALS BY EMAIL TO: bids@banabuilders.com OR FAX TO: (415) 349-4689. Click on above link to view Advertisement for more details.