TitleBAY CORRIDOR TRANSMISSION & DISTRIBUTION - PHASE 2 (2019) NORTH
Bid Date12/10/2019
Description

The San Francisco Public Utilities Commission (“SFPUC”), a department of the City and County of San Francisco (the "City"), seeks to retain the services of a Design-Builder (“DB”) to provide design and construction services for the Bay Corridor Transmission and Distribution ("BCTD") - Phase 2 ("P2") - North Project ("BCTD P2 North Project" or "Project") located in San Francisco, CA.

Design-Build services will include, but are not be limited to, providing design, engineering, permitting, procurement of labor, materials procurement, construction, delivery, installation, and testing of: (1) Scope 1: New underground electrical duct bank and vaults, (2) Scope 2: New Auxiliary Water System Supply (AWSS) ductile iron pipe, (3) Scope 3: New roadway and sidewalk and/or restoration thereof. The SFPUC at its discretion may also call upon the selected Design-Builder to provide other related specialized services at the discretion of the SFPUC.

ESTIMATED COST: $27,542,000

Upload Ads
Click link to view image:Bay-Corridor-NORTH-NBD-12-10-19.pdf
ContractorMitchell Engineering
Description

Mitchell Engineering, an Equal Opportunity Employer, is requesting bids from ALL QUALIFIED AND/OR CERTIFIED SAN FRANCISCO LBE. Subcontracting Participation Requirement is 10% Small and Micro for construction work/services. For MBE construction work/services participation follows: 4.3% MBE, 1.3% WBE, 4.4% OBE. Truckers and Material/Equipment Suppliers are requested to forward bids for the following project. Mitchell Engineering encourages subcontractors quotes to utilize other LBE and MBE firms through second tier subcontracting, owner-operated equipment, or purchase of materials. This also includes requests for Non-LBE/MBE sub/material quotes from qualified subcontractors, trucking firms and material suppliers.

Mitchell Engineering request sub proposals in the format of the bid form for the following trades: Micro-tunneling; Bore & Jack; Electrical; Concrete (includes curb and gutter); Utility Vaults; Traffic Control; Television Inspection; Steel Pipe Casing; Gate Valves; Paving (including Asphalt Concrete and Stripping); Ductile Iron Pipe - Earthquake Resistant DIP; Start up and Testing Coordinator; Trucking (includes off haul of Hazardous Material); Survey; HDPE Pipe; and Testing for the following Project: BAY CORRIDOR TRANSMISSION AND DISTRIBUTION - PHASE 2 (2019) NORTH (Contract #DB-129.1) located in San Francisco, CA. Bids are due no later than December 10, 2019, at 2 PM.

PLEASE NOTE: Mitchell Engineering is requesting bids by NOON ON TUESDAY, DECEMBER 10, 2019 in order for bids to be considered.

Please respond with an email with your intent to bid this Project. All questions are welcomed. Please contact Don Hart at (415) 589-7308, or by email at: dhart@mitchell-engineering.com OR Cameron McGowan at: cmcgowan@mitchell-engineering.com OR Kathy Streblow at: kstreblow@mitchell-engineering.com

BIDS SHOULD BE FAXED TO (415) 227-1049 or (415) 227-1046. Click on above link to view Advertisement for more details.