Skip to main content
TitleANDREW HILL HIGH SCHOOL DW INFRASTRUCTURE ADA WALKWAY
Bid Date07/08/2020
Description

Remove and replace PCC sidewalk; remove existing planter seat walls and install Streetscape concrete benches; remove existing drop inlet and install new one as specified; remove existing utility box and install new one; remove and replace existing door stops; remove existing handrails and install new handrails at water fountains; and any/all other miscellaneous details associated with the work.

Upload Ads
Click link to view image:Andrew-Hill-HS-6-19-20.pdf
ContractorNBC Construction & Engineering, Inc.
Description

NBC CONSTRUCTION & ENGINEERING, INC. is requesting Proposals on ALL TRADES from all qualified Subcontractors and Suppliers, including DVBE/LBE/DBE/SBE/MBE/WBE firms for the Project known as: ANDREW HILL HIGH SCHOOL DW INFRASTRUCTURE ADA WALKWAY (Project #B-18-19-20) located at 3200 Senter Road, San Jose, CA 95111. BIDS ARE DUE NO LATER THAN WEDNESDAY, JULY 8, 2020, AT 2 PM.

All Bidders are hereby notified that the District has a Labor Compliance Program (LCP). Prevailing Wages in effect on this Project and all contractors and subcontractors bidding this Project will be required to comply with the LCP. In addition, all Certified Payrolls (CPR) must be reported through Elation System and DIR website.

SUBMIT PROPOSALS BY EMAIL TO: msnbcinc@gmail.com OR FAX TO (800) 622-9144. Questions should be directed to Mike Schalchi at (925) 322-7473. Click on above link to view Outreach Advertisement for more details.