Title | EVERGREEN VALLEY COLLEGE (EVC) WEST CAMPUS ADA UPGRADES |
---|---|
Bid Date | 10/16/2020 |
Description | Exterior renovation of the Campus West Entry Pathway, Cedro Plaza and Library Plaza. Work includes demo, earthwork, exterior improvements, utilities, and landscaping. Scope includes removal of existing water fountains and nonstructural walls, and replacement of concrete pavement and outdoor lighting. Construction of 3 fabric shade structures. The project is about 30,000 sf. Contractor must coordinate its work with a scheduled power shutdown, as well as ongoing day-to-day operations of an active school site. Engineer's Estimate: $2,140,000 |
Upload Ads | |
Click link to view image: | EVC-West-Campus-ADA-Upgrades-NBD-10-16-20.pdf |
Contractor | OnPoint Construction |
Description | ON POINT CONSTRUCTION, as a "GENERAL CONTRACTOR" is requesting quotations for Landscapers; Demolition; Electrical; Concrete from all qualified Subcontractors and Suppliers, including SBE/LBE/DVBE/DBE firms for the following project: EVERGREEN VALLEY COLLEGE (EVC) WEST CAMPUS ADA UPGRADES (Project #X2016.0067) located at 3095 Yerba Buena Road, San Jose, CA 95135. Bids are due on October 16, 2020, at 2 PM. PLEASE NOTE: OnPoint Construction is requesting quotations NO LATER THAN NOON ON THURSDAY, OCTOBER 15, 2020. Please Contact Dorris Koutantos at (650) 347-3090, or by email at: onpointdk@att.net with any questions. SUBMIT PROPOSAL BY EMAIL TO: onpointdk@att.net OR fax to (650) 347-3099. Click on above link to view Advertisement for more details. OnPoint Construction is an Equal Opportunity Employer |