Skip to main content
TitleGEORGE WASHINGTON HIGH SCHOOL STOREFRONT AND TERRACOTTA REPLACEMENT
Bid Date06/01/2021
Description

The Project is generally described as: Storefront Replacement work at the Gymnasium, Shop Building and Terracotta Replacement work at the Auditorium. The work also includes maintenance work at miscellaneous locations not limited to the hazardous abatement of finishes associated to the demolition of existing storefronts, windows, doors, terracotta repair work, installation of new windows, new doors, metal lockers, flashing, flooring, lighting and painting at the affected areas.

Project Labor Agreement: All Bidders are hereby notified that the District has a Project Labor Agreement (PLA) in effect on the Project and all contractors and subcontractors bidding this project will be required to comply with the PLA.

Estimated Construction Value: $1,000,000

Upload Ads
Click link to view image:George-Washington-HS-11898_5-6-21.pdf
ContractorWickman Development & Construction
Description

WICKMAN DEVELOPMENT & CONSTRUCTION, as a General Contractor, requests sub-bids on ALL TRADES from all qualified Subcontractors and Suppliers, including certified DVBE/LBE/DBE/SBE/MBE/WBE Subcontractors and Suppliers for the Project known as: GEORGE WASHINGTON HIGH SCHOOL STOREFRONT AND TERRACOTTA REPLACEMENT (SFUSD Project #11898) located at 600 32nd Ave, San Francisco, CA 94121. General Contractor bids are due to Owner on Tuesday, June 1, 2021, at 2:00 PM.

PLEASE NOTE: SUB BIDS ARE DUE TO WICKMAN DEVELOPMENT & CONSTRUCTION BY 10:00 AM ON TUESDAY, JUNE 1, 2021.

Union Affiliations: Wickman Development and Construction is signatory to the Carpenter’s and Laborer’s Unions of Northern California Master Agreement. All sub-contractors who intend to bid scopes of work to Wickman Development and Construction that fall under the Master Agreement of these unions must also be signatory to these unions or we cannot list them for that portion of work.

Questions may be directed to Jonathan D. Wickman by calling (415) 239-4500, or by email to: jonathan@wickmandev.com

BIDS SHOULD BE EMAILED TO: jonathan@wickmandev.com OR FAXED TO (415) 239-4511. Click on above link to view Outreach Advertisement for more details.

Click link to view image:George-Washington-HS-11898_5-7-21.pdf
ContractorPinguelo Construction, Inc.
Description

PINGUELO CONSTRUCTION, INC., as a General Contractor, requests quotations from all qualified Subcontractors and Material Suppliers, including certified MBE/WBE/DBE/DVBE Subcontractors and Suppliers for the Project known as: GEORGE WASHINGTON HIGH SCHOOL STOREFRONT AND TERRACOTTA REPLACEMENT (SFUSD Project #11898) located at 600 32nd Ave, San Francisco, CA 94121. General Contractor bids are due to Owner on Tuesday, June 1, 2021, at 2:00 PM.

PLEASE NOTE: SUBCONTRACTOR AND SUPPLIER BIDS ARE DUE TO PINGUELO CONSTRUCTION BY NOON ON TUESDAY, JUNE 1, 2021.

Trades Needed Include: Terracotta Repair, Doors, Lockers, Flashing, Flooring, Electrical, Painting, Abatement. Bonding may be required. Questions should be directed to Chad Pinguelo at (707) 864-3003, or by email at: chadpinguelo@yahoo.com.

SUBMIT PROPOSALS BY EMAIL TO: chadpinguelo@yahoo.com, OR FAX TO: (707) 864-1661. Please click on above link to view Outreach Advertisement for more details.

Pinguelo Construction, Inc. is an Equal Opportunity Employer.

Click link to view image:George-Washington-HS-11898_5-14-21.pdf
ContractorNBC Construction & Engineering, Inc.
Description

NBC CONSTRUCTION & ENGINEERING, INC. is requesting Proposals on ALL TRADES from all qualified Subcontractors and Material Suppliers, including DVBE/LBE/DBE/SBE/MBE/WBE Subcontractors and Material Suppliers for the Project known as: GEORGE WASHINGTON HIGH SCHOOL STOREFRONT AND TERRACOTTA REPLACEMENT (SFUSD Project #11898) located at 600 32nd Ave, San Francisco, CA 94121. General Contractor bids are due to Owner on Tuesday, June 1, 2021, at 2:00 PM.

PLEASE NOTE: NBC Construction & Engineering requests sub bids by 11:00 AM on TUESDAY, JUNE 1, 2021.

All Bidders are hereby notified that provisions of the Labor Code of the State of California, regarding Prevailing Wages shall be applicable to the work performed under this Contract. Pursuant to Labor Code Section 1773, the General Prevailing Wage Rates have been determined by the Director of the California Department of Industrial Relations and appear in the California and Federal Prevailing Wage Rates, which can be found at: https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm. Future effective wage rates which have been predetermined and are on file with the CA DIR are referenced but not printed in such publication.

SUBMIT PROPOSALS BY EMAIL TO: estimatingnbcinc@gmail.com OR FAX TO (800) 622-9144. Questions should be directed to Mike Schalchi at (925) 322-7473. Click on above link to view Outreach Advertisement for more details.

Click link to view image:George-Washington-HS-11898_5-17-21.pdf
ContractorBuild Group, Inc.
Description

BUILD GROUP, INC., as a "GENERAL CONTRACTOR", is requesting proposals on "ALL TRADES" from all qualified Subcontractors and Material Suppliers, including certified DVBE/LBE/DBE/SBE/MBE/WBE Subcontractors and Material Suppliers for the Project known as: GEORGE WASHINGTON HIGH SCHOOL STOREFRONT AND TERRACOTTA REPLACEMENT (SFUSD Project #11898) located at 600 32nd Ave, San Francisco, CA 94121. General Contractor bids are due to Owner on Tuesday, June 1, 2021, at 2:00 PM.

PLEASE NOTE: BUILD GROUP IS REQUESTING SUB BIDS BY NOON ON MONDAY, MAY 31, 2021.

Questions may be directed to Katie Ogden at (310) 963-6393.

SUBMIT PROPOSALS BY EMAIL TO: estimatingpw@buildgc.com, OR fax to (415) 366-1883. Please click on above link to view Outreach Advertisement for more details.