Title | ALAMEDA POINT REUSE AREA REPLACEMENT INFRASTRUCTURE PHASE 1 AND 2 |
---|---|
Bid Date | 01/25/2022 |
Description | The Project includes, but is not limited to, performing the following Work: This Project is situated on the following City streets: Engineer's Estimate: $25,000,000 - $28,000,000 |
Upload Ads | |
Click link to view image: | Alameda-Pt-Reuse-Area-1-13-22.pdf |
Contractor | Mitchell Engineering |
Description | MITCHELL ENGINEERING, a San Francisco Contractor and Equal Opportunity Employer, is seeking Subcontractor quotes, Owner-Operator Equipment, and Material/Equipment Suppliers for the Project advertised as: ALAMEDA POINT REUSE AREA REPLACEMENT INFRASTRUCTURE PHASE 1 AND 2. Mitchell Engineering will be bidding as a Prime and requests Subcontractors/Vendors and Trucking proposals in the format of the Bid Form for the following trades: Traffic Control; Concrete Work Including Sidewalks; Street Lights Conduits, Boxes, Wiring; Television Inspection; Grading, Paving & Bikeway Paving; Domestic Backflow Devices; Trucking; Vaults; Pipe and Valve Materials; Manholes; Electrical; and SWPPP. Bids are due to Owner on January 25, 2022, at 2:30 PM. PLEASE NOTE: Mitchell Engineering is requesting bids by NOON ON TUESDAY, JANUARY 25, 2022 in order for bids to be considered. Please respond with an email with your intent to bid this Project. Mitchell Engineering welcomes all questions. Please contact Don Hart, Scott Tilley, or Kathy Streblow at (415) 589-7311 or (415) 227-1040, or by email at: dhart@mitchell-engineering.com; stilley@mitchell-engineering.com; kstreblow@mitchell-engineering.com. BIDS SHOULD BE FAXED TO (415) 227-1049 or (415) 227-1046. Click on above link to view Outreach Advertisement for more details. |