Skip to main content
TitleMILLBRAE TAIL TRACKS EXTENSION - BART #15CH-110
Bid Date02/01/2022
Description

The prime scope of the Project is to upgrade existing W1, W2 and W4 tail tracks by about 309 feet each from end of line beyond BART Millbrae Station, to allow BART to store an additional 3 rail cars on each track to make 10-car trains available for ease of service start up at Millbrae Station that currently have a 7-car train storage capacity. The improvements are very essential to increase system wide operational capacity as the BART Warm Spring (WSX) and the San Jose (SVBX) Extension projects are coming online. Accordingly, the Project will relocate Friction Bumpers, and extend traction power and train control, lighting, asphalt concrete and cement concrete cart path, retaining walls, and high security fencing. The new tail tracks would be located on an enclosed swath of land owned by BART. Please refer to Technical Specifications Section 01 11 00 Summary of Work for more information.

Engineer's Estimate: $8,500,000 - $9,500,000

Upload Ads
Click link to view image:BART-Millbrae-Tail-Tracks-15CH-110_1-14-22.pdf
ContractorMitchell Engineering
Description

MITCHELL ENGINEERING, a San Francisco Contractor and Equal Opportunity Employer, requests bids from ALL QUALIFIED AND/OR CERTIFIED DBE including WBE/MBE/SBE Subcontractors. Subcontracting Participation Requirement is 25.00%. Mitchell Engineering encourages Subcontractors quotes to utilize other DBE/SBE firms through second tier subcontracting, owner operated equipment, or purchase of materials. Mitchell Engineering also encourages non-DBE/SBE Subcontractors and Material/Equipment Suppliers to forward bids for the following Project.

Mitchell Engineering will be bidding as a Prime and requests Subcontractors/Vendors and Trucking proposals in the format of the Bid Form for the following trades: Traffic Control; Concrete Work; High Security Fencing & Temp Fencing; Electrical & Lighting Work; Grading & Paving; Shoring; Trucking; Structural Concrete; Pipe Materials; Manholes; Guard Rails; Rail Materials; Welding; and Video Inspection for the Project advertised as: MILLBRAE TAIL TRACKS EXTENSION - BART #15CH-110 in Millbrae, CA. Bids are due to Owner on February 1, 2022, at 2:00 PM.

PLEASE NOTE: Mitchell Engineering is requesting bids by 11:00 AM ON TUESDAY, FEBRUARY 1, 2022 in order for bids to be considered.

Please respond with an email with your intent to bid this Project. Mitchell Engineering welcomes all questions. Please contact Don Hart, Scott Tilley, or Kathy Streblow at (415) 589-7311 or (415) 227-1040, or by email at: dhart@mitchell-engineering.com; stilley@mitchell-engineering.com; kstreblow@mitchell-engineering.com.

BIDS SHOULD BE FAXED TO (415) 227-1049 or (415) 227-1046. Click on above link to view Outreach Advertisement for more details.