Title | SAFETY IMPROVEMENTS OF RAILROAD CROSSING AT 85TH AVENUE AND 105TH AVENUE |
---|---|
Bid Date | 05/12/2022 |
Description | The Project installs railroad crossing safety improvements at two railroad crossings at 85th Avenue and 105th Avenue in Oakland. The improvements include new sidewalks, detectable warning strips, signage and a median island. Engineer's Estimate: $895,810 |
Upload Ads | |
Click link to view image: | Safety-Improvements-of-Railroad-Crossing-Oakland-4-29-22.pdf |
Contractor | NBC Construction & Engineering, Inc. |
Description | NBC CONSTRUCTION & ENGINEERING, INC. is requesting Proposals on ALL TRADES from all qualified Subcontractors and Material Suppliers, including DVBE/LBE/DBE/SBE/MBE/WBE Subcontractors and Material Suppliers for the Project advertised as: Safety Improvements of Railroad Crossing at 85th Avenue and 105th Avenue (Project #1000977) located in Oakland, CA. General Contractor bids are due to Owner on Thursday, May 12, 2022, at 12:00 PM. PLEASE NOTE: NBC Construction & Engineering requests sub bids by Noon on THURSDAY, MAY 12, 2022. All Bidders are hereby notified that provisions of the Labor Code of the State of California, regarding Prevailing Wages shall be applicable to the work performed under this Contract. Pursuant to Labor Code Section 1773, the General Prevailing Wage Rates have been determined by the Director of the California Department of Industrial Relations and appear in the California and Federal Prevailing Wage Rates, which can be found at: https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm. Future effective wage rates which have been predetermined and are on file with the CA DIR are referenced but not printed in such publication. PLEASE SUBMIT PROPOSALS BY EMAIL TO: estimatingnbcinc@gmail.com, OR FAX TO (800) 622-9144. Questions should be directed to Mike Schalchi at (925) 322-7473. Click on above link to view Outreach Advertisement for more details. |