TitleTRANSBAY TRANSIT CENTER TRACTION POWER IMPROVEMENT - SFMTA
Bid Date05/12/2022
Description

This Project is to upgrade the traction power system to support trolley coach service for the new Transbay Transit Center Bus Plaza. The Work will consist of the following:
A. Trench about 2750 linear feet (4 wide by 6’ deep), core drill from manhole to manhole along Mission Street for MHs 3, 5A, 1206, 1205, 1204, 1203, 1202, 1201, and 1200 for the 2-4” High Density Polyethylene (HDPE) duct bank for feeder circuit D-17, and pull new cables.
B. Terminate, splice, and retag existing feeder circuit cables for D-14, D-16 and CC-16 in manholes 3, 5A, 1206, 1205, 1204, 1203, 1202, 1201, and 1200 along Mission Street.
C. Pull and splice new cables in MH 1641 on Market and 4th and MH 1640 on Market and 3rd.
D. Provide infrastructure (pull box on the sidewalk and 2-4” & 2-2” HDPE duct bank from MH 1203) for a future tie-in between D-16 and CC-16 at Mission and 3rd Street.
E. Reconstruct six (6)curb ramps to meet ADA requirement.
F. Perform commissioning and acceptance tests.

The above description of the Work is a general summary only and does not modify the requirements set out in the Specifications, Drawings or other Contract Documents.

Engineer's Estimate: $3,900,000

Upload Ads
Click link to view image:Transbay-Transit-Ctr-5-2-22.pdf
ContractorMitchell Engineering
Description

MITCHELL ENGINEERING, a San Francisco Contractor and Equal Opportunity Employer, requests Sub Bids from ALL QUALIFIED AND/OR CERTIFIED LBE Subcontractors. Subcontracting Participation Requirement is 35.00%. Certified Small or Micro-LBEs, SBA-LBEs, including certified non-profit organizations, are eligible for an LBE bid discount if the LBE is CMD certified. Mitchell Engineering encourages Subcontractors quotes to utilize other LBE firms through second tier subcontracting, owner-operated equipment, or purchase of materials. In addition, all Material/Equipment Suppliers LBE are requested to forward bids for the following project.

Mitchell Engineering will be bidding as a Prime and requests Subcontractors/Vendors and Trucking proposals in the format of the Bid Form for the following trades: Trenching; Hazardous Material Hauling; Trucking; Core Drilling; Manholes; Concrete; Rebar; Electrical; Duct Bank; Valves; Piping Materials; Landscaping; and Paving for the Project advertised as: TRANSBAY TRANSIT CENTER TRACTION POWER IMPROVEMENT - SFMTA in San Francisco, CA (Contract #1317). Bids are due to Owner on May 12, 2022, at 3:00 PM.

PLEASE NOTE: Mitchell Engineering is requesting bids by 11:00 AM ON THURSDAY, MAY 12, 2022 in order for bids to be considered.

Please respond with an email with your intent to bid this Project. Mitchell Engineering welcomes all questions. Please contact Don Hart, Scott Tilley, or Kathy Streblow at (415) 589-7311 or (415) 227-1040, or by email at: dhart@mitchell-engineering.com; stilley@mitchell-engineering.com; kstreblow@mitchell-engineering.com.

BIDS SHOULD BE FAXED TO (415) 227-1049 or (415) 227-1046. Click on above link to view Outreach Advertisement for more details.