Skip to main content
TitleSUNNYVALE CLEAN WATER PROGRAM (SCWP) SECONDARY TREATMENT AND THICKENING/DEWATERING - CAS STAGE 1
Bid Date08/24/2022
Description

The Work includes site work, new building construction, installation of major process equipment, yard piping within the Water Pollution Control Plant boundaries, existing facility modification/demolition, electrical, instrumentation. control system improvements, and related systems and facilities. Due the specialized nature and complexity of the electrical and instrumentation and controls portion of the Work, the City has developed a list of pre-qualified Electrical Subcontractors through a prior “Request for Statements of Pre-qualifications from Interested Electrical Subcontractors.

Engineer's Estimate: $250,000,000

Upload Ads
Click link to view image:SCWP-Secondary-Treatment-Dewatering-Sunnyvale-NBD-8-10-22.pdf
ContractorWalsh Construction Company II, LLC
Description

WALSH CONSTRUCTION COMPANY II, LLC, an equal opportunity employer and strongly supports workforce diversity, requests Sub-Bids from ALL QUALIFIED AND/OR CERTIFIED MBE/WBE/SBE/DBE Subcontractors and Material Suppliers for the following project:

SUNNYVALE CLEAN WATER PROGRAM (SCWP) SECONDARY TREATMENT AND THICKENING/DEWATERING - CAS STAGE 1, located at 1444 Borregas Avenue, Sunnyvale, CA 94089 (Project #UY-21-07).

Walsh Construction is bidding, as a Prime Contractor, the Secondary Treatment And Dewatering Project for the City of Sunnyvale. Walsh is seeking bids from firms for the following services and/or materials. Walsh Construction is willing to discuss breaking out any portion of the work into economically feasible units to facilitate DBE participation: PIPELINES, CONCRETE, REBAR, GROUTING, MASONRY, STEEL FRAMING, JOINT SEALANTS, DRY-WALL, MISC. METALS, CARPENTRY, FIBERGLASS REINFORCED PRODUCTS, INSULATION, ROOF, WINDOWS AND DOORS, SKYLIGHTS, FLOORING, PAINTING AND COATINGS, SIGNAGE, TOILET ACCESSORIES, FIRE EXTINGUISHERS, METAL LOCKERS, WINDOW SHADES, FIRE SUPPRESSION, PLUMBING, HVAC, ELECTRICAL, SHORING, PAVING, FENCING, LANDSCAPING, MANHOLES, PROCESS PIPE AND PROCESS EQUIPMENT, WELL AND WELL PUMP MODIFICATIONS, DEMOLITION, EARTHWORK, TRUCKING, STRUCTURAL STEEL, DECKING, DAMPPROOFING, INSULATION, FLASHING AND SHEET METAL, GYPSUM BOARD, CERAMIC TILING, ACOUSTIC PANELS, CATHODIC PROTECTION, FIRE PROTECTION, DEWATERING, AUGER CAST PILES, METAL BUILDING SYSTEMS, ROLLER WINDOW SHADES, PRESTRESSED TANK, INSTRUMENTATION/CONTROLS.

PLEASE NOTE: Scope Letters are due on WEDNESDAY, AUGUST 3, 2022, at 3:00 PM. Prime Contractor bids are due to Owner on WEDNESDAY, AUGUST 24, 2022, AT 3:00 PM.

Point of Contact is: Contact: Krystal Bettiga at (925) 627-1718.

Please send all correspondence, questions, and quotes to: norcalwaterestimating@walshgroup.com. Click on above link to view Outreach Advertisement for more details.