Title | EXISTING PLANT REHABILITATION PROJECT |
---|---|
Bid Date | 11/16/2022 |
Description | Project consists of site work, installation of major process equipment, yard piping within the Water Pollution Control Plant boundaries, existing facility modification, demolition, electrical systems, instrumentation/control system improvements, and related systems and facilities at Sunnyvale Water Pollution Control Plant. Engineer's Estimate: $37,000,000 - $42,000,000 |
Upload Ads | |
Click link to view image: | Existing-Plant-Rehab-Sunnyvale-UY-21-04_10-12-22.pdf |
Contractor | Walsh Construction Company II, LLC |
Description | WALSH CONSTRUCTION COMPANY II, LLC, an equal opportunity employer and strongly supports workforce diversity, requests Sub-Bids from ALL QUALIFIED MBE/WBE/SBE/DBE/SBRA/LSAF/HUB Subcontractors and Material Suppliers for the the project advertised as: EXISTING PLANT REHABILITATION, located at 1444 Borregas Avenue, Sunnyvale, CA 94089 (Project #UY-21-04). Walsh Construction is bidding, as a Prime Contractor, the Existing Plant Rehabilitation Project for the City of Sunnyvale. Walsh is seeking bids from firms for the following services and/or materials; we are willing to discuss breaking out any portion of the work into economically feasible units to facilitate DBE participation: PIPELINES, CONCRETE, REBAR, GROUTING, MASONRY, STEEL FRAMING, JOINT SEALANTS, DRY-WALL, MISC. METALS, CARPENTRY, FIBERGLASS REINFORCED PRODUCTS, INSULATION, ROOF, WINDOWS AND DOORS, SKYLIGHTS, FLOORING, PAINTING AND COATINGS, SIGNAGE, TOILET ACCESSORIES, FIRE EXTINGUISHERS, METAL LOCKERS, WINDOW SHADES, FIRE SUPPRESSION, PLUMBING, HVAC, ELECTRICAL, SHORING, PAVING, FENCING, LANDSCAPING, MANHOLES, PROCESS PIPE AND PROCESS EQUIPMENT, WELL AND WELL PUMP MODIFICATIONS, DEMOLITION, EARTHWORK, TRUCKING, STRUCTURAL STEEL, DECKING, DAMPPROOFING, INSULATION, FLASHING AND SHEET METAL, GYPSUM BOARD, CERAMIC TILING, ACOUSTIC PANELS, CATHODIC PROTECTION, FIRE PROTECTION, DEWATERING, AUGER CAST PILES, METAL BUILDING SYSTEMS, ROLLER WINDOW SHADES, PRESTRESSED TANK, INSTRUMENTATION/CONTROLS. PLEASE NOTE: Scope Letters are due on WEDNESDAY, NOVEMBER 9, 2022, at 3:00 PM. Prime Contractor bids are due to Owner on Wednesday, November 16, 2022, at 3:00 PM. Sub Bids are due to Walsh Construction NO LATER THAN TUESDAY, NOVEMBER 15, 2022. Point of Contact is: Contact: Krystal Bettiga at (925) 627-1718. Please send all correspondence, questions, and quotes to: norcalwaterestimating@walshgroup.com. Click on above link to view Outreach Advertisement for more details. |