Skip to main content
TitleGOLDEN GATE BRIDGE TOLL PLAZA ADMINISTRATION BUILDING DOOR AND WINDOW REHABILITATION
Bid Date01/10/2023
Description

The scope of work includes removing and disposing existing fixed glass window panels and replacing the single glass panel with a top and bottom fixed glass panel and a middle operable awning style window panel, removing an existing automatic sliding door system and replacing with a new automatic sliding door system, and all other related work items as required to complete the project titled Golden Gate Bridge Toll Plaza Administration Building Door and Window Rehabilitation Project, as shown on the Contract Drawings and as specified in the Contract Documents.

Engineer's Estimate: $131,500.00

Upload Ads
Click link to view image:GGB-Toll-Plaza-Admin-Bldg-2022-B-104_1-10-23.pdf
ContractorPinguelo Construction, Inc.
Description

PINGUELO CONSTRUCTION, INC., as a General Contractor, requests quotations from all qualified Subcontractors and Material Suppliers, including certified MBE/WBE/DBE/DVBE Subcontractors and Suppliers for the Project advertised as: GOLDEN GATE BRIDGE TOLL PLAZA ADMINISTRATION BUILDING DOOR AND WINDOW REHABILITATION (Contract #2022-B-104) located in San Francisco, CA. General Contractor bids are due on Tuesday, January 10, 2023, at 2:00 PM.

PLEASE NOTE: SUBCONTRACTOR AND SUPPLIER BIDS ARE DUE TO PINGUELO CONSTRUCTION BY NOON ON TUESDAY, JANUARY 10, 2023.

Trades Needed Include: Windows, Caulking, Paint, and Dumpster. Bonding may be required.

Questions should be directed to Chad Pinguelo at (707) 864-3003, or by email at: chadpinguelo@yahoo.com.

PLEASE SUBMIT PROPOSALS BY EMAIL TO: chadpinguelo@yahoo.com, OR fax to: (707) 864-1661. Click on above link to view Outreach Advertisement for more details.

Pinguelo Construction, Inc. is an Equal Opportunity Employer.