Title | MARINA MIDDLE SCHOOL COURTYARD RESTORATION |
---|---|
Bid Date | 03/14/2023 |
Description | The Project is generally described as: resurfacing and restriping of the play yard, including, but not limited to, the grinding of temporary asphalt surfaces, patching of existing asphalt, new slurry seal, installation of new trench drain, installation of new backflow preventer, installation of new ornamental fencing and gate, restriping play yard and parking areas, installation of new athletic equipment, and removal and installation of two plumbing flapper valves. Estimated Construction Value: $758,000 |
Upload Ads | |
Click link to view image: | Marina-MS-Courtyard-11894_2-28-23.pdf |
Contractor | BEAM Construction, Inc. |
Description | BEAM CONSTRUCTION, INC., as a General Contractor, is soliciting quotes from all qualified Subcontractors and Suppliers, including certified UDBE/DBE/DVBE/SBE/LBE Subcontractors and Suppliers for the Project advertised as: MARINA MIDDLE SCHOOL COURTYARD RESTORATION (SFUSD Project #11894) located at 3500 Fillmore St., San Francisco, CA 94123. General Contractor bids are due on March 14, 2023, at 2:00 PM. PLEASE NOTE: Sub Bids are due to BEAM Construction NO LATER THAN MONDAY, MARCH 13, 2023, in order for bids to be considered. Subcontractor/Supplier opportunities may include, but are not limited to, Excavation, Environmental Management, Concrete, Structural Steel, Plumbing, Earthwork, Grading, Paving, Fencing, and Striping. Questions may be directed to Brian Reilly by calling (415) 317-3603, or by email at: info@beamconstructioninc.com PLEASE SUBMIT PROPOSALS BY EMAIL TO: info@beamconstructioninc.com. Click on above link to view Outreach Advertisement for more details. |
Click link to view image: | Marina-MS-Courtyard-11894_3-1-23.pdf |
Contractor | NBC Construction & Engineering, Inc. |
Description | NBC CONSTRUCTION & ENGINEERING, INC. is requesting Proposals on ALL TRADES from all qualified Subcontractors and Material Suppliers, including DVBE/LBE/DBE/SBE/MBE/WBE Subcontractors and Material Suppliers for the Project advertised as: MARINA MIDDLE SCHOOL COURTYARD RESTORATION (SFUSD Project #11894) located at 3500 Fillmore St., San Francisco, CA 94123. General Contractor bids are due on March 14, 2023, at 2:00 PM. PLEASE NOTE: NBC Construction & Engineering requests Sub Bids by NOON on TUESDAY, MARCH 14, 2023, in order for bids to be considered. All Bidders are hereby notified that provisions of the Labor Code of the State of California, regarding Prevailing Wages shall be applicable to the work performed under this Contract. Pursuant to Labor Code Section 1773, the General Prevailing Wage Rates have been determined by the Director of the California Department of Industrial Relations and appear in the California and Federal Prevailing Wage Rates, which can be found at: https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm. Future effective wage rates which have been predetermined and are on file with the CA DIR are referenced but not printed in such publication. PLEASE SUBMIT PROPOSALS BY EMAIL TO: estimatingnbcinc@gmail.com, OR FAX TO (800) 622-9144. Questions should be directed to Mike Schalchi at (925) 322-7473. Please click on above link to view Outreach Advertisement for more details. |
Click link to view image: | Middle-MS-Courtyard-11894_3-9-23.pdf |
Contractor | Eternal Construction, Inc. |
Description | ETERNAL CONSTRUCTION, INC. is requesting Sub-Bids on ALL TRADES from all qualified Subcontractors and Suppliers, including DVBE, MBE, LBE & WBE firms for the Project advertised as: MARINA MIDDLE SCHOOL COURTYARD RESTORATION (SFUSD Project #11894) located at 3500 Fillmore St., San Francisco, CA 94123. General Contractor bids are due on March 14, 2023, at 2:00 PM. PLEASE NOTE: Eternal Construction request Sub Bids no later than NOON ON TUESDAY, MARCH 14, 2023. PLEASE SUBMIT PROPOSALS BY EMAIL TO: jackng@eternalconst.com OR FAX TO: (650) 692-6686. Questions should be directed Jack Ng at (650) 692-6638. Click on above link to view Outreach Advertisement for more details. |