Skip to main content
TitleLEONARD FLYNN ELEMENTARY SCHOOL BUILDING WALLS & FENCE REPAIRS
Bid Date03/06/2024
Description

The Project is generally described as: General repairs to the exterior building walls and perimeter fencing. The Work includes, but is not limited to:
i Repair and reconstruction of the existing perimeter fence concrete pilasters along Harrison Street and Precita Avenue, and the existing concrete wall fence in the south play yard.
ii Repairs and restoration of the spalled exterior concrete walls and decorative moldings around the window openings.
iii Repairs of cracked exterior walls and decorative moldings of the building that involves stripping of the existing coatings down to bare concrete, concrete wall and cement plaster restoration, application of joint sealants and high-performance coating, and painting.
iv Allowance Nos. 1 and 2 as described under Section 01 21 00.
v The Work also includes hazardous material abatement as described and specified in Appendix A of the Contract Documents.

Estimated Construction Value: $250,000

Upload Ads
Click link to view image:Leonard-Flynn-ES-12321_02-14-24.pdf
ContractorAngotti & Reilly, Inc.
Description

ANGOTTI & REILLY, INC. request certified DBE, DVBE subcontractors to submit BID proposals for the Project advertised as: LEONARD FLYNN ELEMENTARY SCHOOL BUILDING WALLS & FENCE REPAIRS (SFUSD Project #12321) located at 3125 Cesar Chavez St., San Francisco, CA 94110. General Contractor Bids are due on March 6, 2024, at 2:00 PM.

TRADES REQUESTED: DEMO | HAZMAT ABATEMENT | CONCRETE REINFORCEMENT, CAST-IN-PLACE | JOINT SEALANTS | PAINTING

PLEASE NOTE: Angotti & Reilly request proposals BEFORE 11:00 AM ON WEDNESDAY, MARCH 6, 2024 to allow ample time to review proposals.

Please contact James Reilly at (415) 575-3700, or by email at: estimating@angotti-reilly.com with any questions.

PLEASE SUBMIT PROPOSALS BY EMAIL TO: estimating@angotti-reilly.com. Click on above link to view Outreach Advertisement for more details.

Click link to view image:Leonard-Flynn-ES-12321_02-16-24.pdf
ContractorBetter Building Construction
Description

BETTER BUILDING CONSTRUCTION, an Equal Opportunity Employer, is requesting quotations from all Subcontractors and Suppliers, including qualified/certified DVBE/DBE/MBE/WBE/SBE/LBE Subcontractors and Suppliers for the Project advertised as: LEONARD FLYNN ELEMENTARY SCHOOL BUILDING WALLS & FENCE REPAIRS (SFUSD Project #12321) located at 3125 Cesar Chavez St., San Francisco, CA 94110. General Contractor Bids are due on March 6, 2024, at 2:00 PM.

PLEASE NOTE: Better Building Construction is requesting proposals NO LATER THAN 2:00 PM ON TUESDAY, MARCH 5, 2024.

Please contact Kyle Zhou at (415) 465-0552, or by email at: kylezhou.bbc@gmail.com with any questions.

PLEASE SUBMIT PROPOSALS BY EMAIL TO: kylezhou.bbc@gmail.com. Click on above link to view Outreach Advertisement for more details.