Title8-INCH AND 12-INCH DUCTILE IRON WATER MAIN AND SEWER REPLACEMENT ON GRAND VIEW AVENUE FROM CLIPPER STREET TO ROMAIN STREET, AND VARIOUS AREA STREEETS
Bid Date10/10/2024
Description

The objective of the Project is to replace aging water facilities which have a history of reoccurring main breaks in order to improve reliability of distribution system and replace sewer pipes that have reached the end of their useful life. The Work to be performed under this contract includes the replacement of existing water mains with 8-inch and 12-inch ductile iron pipe and replacement of existing sewer mains with 12-inch vitrified clay pipe, installation of new curb ramps and pavement renovation. The Work is to be performed in San Francisco, California.

Engineer's Estimate: $10,800,000

Upload Ads
Click link to view image:Ductile-Iron-Water-Main-WD-2875_NBD_10-10-24.pdf
ContractorMitchell Engineering
Description

MITCHELL ENGINEERING, a San Francisco Contractor and Equal Opportunity Employer, request Sub Bids from ALL QUALIFIED AND/OR CERTIFIED Local Business Enterprise (LBE) Subcontractors and Materiel/Equipment Suppliers. The LBE subcontracting requirement can only be met with CMD certified San Francisco Micro and Small-LBEs which include the subcontracting participation breakdown: The Local Business Enterprise (LBE) subcontracting requirement is 15.00%. Micro and Small-LBE subcontracting participation breakdown is: 3.80% MBE; 5.70% WBE; 5.50% OBE.

Mitchell Engineering encourage subcontractors quotes to utilize other LBE firms through second tier subcontracting, owner-operated equipment, or purchase of materials. In addition, all Material/Equipment Suppliers LBE are requested to forward bids. Mitchell Engineering also encourage non-LBE subcontractors/sub-tiers/material suppliers to submit bids for the following project.

Mitchell Engineering will be bidding as a Prime and request Subcontractors/Material Suppliers, and Trucking proposals in the format of the Bid Form for the following trades: Traffic Control; Manholes with Covers; Paving; 12 & 15 inch VCP Sewer Pipe; Pull Boxes; Cast Iron Water Trap For Existing Catch Basin; Television Inspection; Trucking - Hazardous Waste; 4, 6 and 8 Inch Ductile Iron Joint Pipe with Polyethylene Encasement; and 12-Inch Ductile Iron Restrained Push-On Joint and Flange Joint Pipe, Ductile Iron Gate Valve for the Project advertised as: 8-INCH AND 12-INCH DUCTILE IRON WATER MAIN AND SEWER REPLACEMENT ON GRAND VIEW AVENUE FROM CLIPPER STREET TO ROMAIN STREET, AND VARIOUS AREA STREETS (Contract #WD-2875). Bids are due to Owner on October 10, 2024, at 2:00 PM.

PLEASE NOTE: Mitchell Engineering is requesting subcontractor bids NO LATER THAN 11:00 AM ON THURSDAY, OCTOBER 10, 2024, to allow ample time for review.

Please respond with an email with your intent to bid this Project. Mitchell Engineering welcomes all questions. Please contact Cameron McGowan, Bobby Martin, or Kathy Streblow at (415) 589-7308 or (415) 227-1040, or by email at: cmcgowan@mitchell-engineering.com; bmartin@mitchell-engineering.com; kstreblow@mitchell-engineering.com.

BIDS SHOULD BE EMAILED TO: cmcgowan@mitchell-engineering.com. You may also fax to (415) 227-1049 or (415) 227-1046. Please click on above link to view Outreach Advertisement for more details.