Skip to main content
TitleLOCAL ADVANCED WATER PURIFICATION SYSTEM (LOCAL AWPS) - CITY OF PALO ALTO
Bid Date01/31/2025
Description

Local AWPS Project consists of two Phases. This IFB is for Phase 1 that will produce 1.125 MGD of reverse osmosis permeate and will include housekeeping pads for future skids and pipe headers sized enough to accommodate expansion. Phase I Motor Control Centers will also accommodate for Phase II electrical loads. The permeate produced from the project will be blended with the existing tertiary-treated recycled water to achieve an instantaneous TDS concentration of 400 to 500 mg/L. The Local AWPS will be constructed without interruption to the current treatment operations, except as allowed under special circumstances, such as piping and utility tie-ins. The electrical service, potable water service and fire water supply will be independent from the RWQCP's service. New service connections will be made with City of Palo Alto Utilities (CPAU).

The Project will construct a new odor control structure, membrane filtration, reverse osmosis system, a new permeate storage tank, blending station, new chemical storage facilities, electrical, instrumentation and control systems. Site work includes pile foundation, concrete slab, yard piping, replacement of a sewer line, paving, grading, landscaping, a metal canopy, a pre-engineered electrical building and a perimeter wall.

Upload Ads
Click link to view image:Local-Advanced-Water-Purification-System-Palo-Alto_12-30-24.pdf
ContractorWalsh Construction Company II, LLC
Description

Walsh Construction is bidding, as a Prime Contractor, the Local Advanced Water Purification System (Local AWPS) Project, CIP: WQ-19003, IFB Number 193197 for the City of Palo Alto. REQUESTING BIDS FROM ALL MBE/WBE/SBE/DBE SUBCONTRACTORS AND SUPPLIERS IN ACCORDANCE WITH THE SWRCB CLEAN WATER STATE REVOLVING FUND (CWSRF) AND USBR TITLE XVI WATER INFRASTRUCTURE IMPROVEMENTS FOR THE NATION ACT (WIIN) COMPETITIVE GRANT PROGRAM GUIDELINES.

Walsh is seeking bids from firms for the following services and/or materials; we are willing to discuss breaking out any portion of the work into economically feasible units to facilitate DBE participation: PIPELINES, CONCRETE, REBAR, GROUTING, MASONRY, STEEL FRAMING, JOINT SEALANTS, DRY-WALL, MISC. METALS, CARPENTRY, FIBERGLASS REINFORCED PRODUCTS, INSULATION, ROOF, WINDOWS AND DOORS, SKYLIGHTS, FLOORING, PAINTING AND COATINGS, SIGNAGE, TOILET ACCESSORIES, FIRE EXTINGUISHERS, FIRE SUPPRESSION SPRINKLER SYSTEM, PLUMBING, HVAC, ELECTRICAL, SHORING, PAVING, FENCING, LANDSCAPING, MANHOLES, PROCESS PIPE AND PROCESS EQUIPMENT, DEMOLITION, EARTHWORK, TRUCKING, STRUCTURAL STEEL, DECKING, DAMPPROOFING, INSULATION, FLASHING AND SHEET METAL, GYPSUM BOARD, CERAMIC TILING, ACOUSTIC PANELS, CATHODIC PROTECTION, FIRE PROTECTION, DEWATERING, INSTRUMENTATION/CONTROLS, CONCRETE CRACK REPAIR, ARCHITECTURAL PRECAST CONCRETE SOUND WALL, PRECAST REINFORCED CONCRETE VAULTS, PRE-ENGINEERED METAL CANOPIES, ASPHALT PAVING, CHAIN LINK FENCING, STEEL CHEMICAL STORAGE TANKS, POLYETHYLENE CHEMICAL STORAGE TANKS, FRP CHEMICAL STORAGE TANKS, WATER AND WASTEWATER EQUIPMENT, CONTINOUS FLIGHT AUGER PILES.

SCOPE LETTERS DUE: 3 PM on Wednesday, January 29, 2025

Please send all correspondence, questions, and quotes to: norcalwaterestimating@walshgroup.com. Project contact is Clay Gunderson at (925) 627-1718.