Skip to main content
TitleWATER POLLUTION CONTROL FACILITY (WPCF) - ADMINISTRATION BUILDING
Bid Date02/11/2025
Description

Construction, startup, and commissioning of the WPCF Administration Building, including all engineering, labor, materials, and equipment as required by the Contract Documents, including but not limited to selective demolition and salvaging of existing facilities and systems; site paving and grading; landscaping and other site improvements; yard piping and electrical systems; structural and architectural work; plumbing and heating, ventilation, and air conditioning systems; laboratory; fire alarm and suppression systems; power supply systems; instrumentation and control systems; and all other items necessary for a complete and functional facility.

Engineer's Estimate: $36,600,000

Upload Ads
Click link to view image:Water-Pollution-Control-Facility-WPCF-Admin-Bldg_12-31-24.pdf
ContractorW.E. Lyons Construction Company
Description

W.E. LYONS CONSTRUCTION CO., as a "GENERAL CONTRACTOR", is requesting quotes from all qualified subcontractors and suppliers including certified DVBE firms for the following items of work, including, but not limited to: survey, demolition, abatement, structural concrete, polished concrete, precast stair treads, grouting, masonry, structural steel, metal decking, misc. metals, casework, FRP, waterproofing, insulation, air barriers, metal wall panels, metal roofing, terra cotta rainscreen panels, TPO roofing, sheet metal, roof accessories, fireproofing, firestopping, joint sealants, doors/frames/hardware, storefronts, glazing, sliding automatic entrances, curtain walls, glass canopies, skylights, mirrors, metal stud and drywall, plaster, tiling, acoustical ceilings, resilient sheet flooring, floor tile, static control flooring, sound absorbing ceiling, painting, visual display units, signage, toilet compartments & accessories, folding panel partitions, glazed interior wall & door assemblies, wall & door protection, fire extinguishers, metal lockers, flagpoles, electric vehicle charging units, automatic gate operating system, residential appliances, lab equip, lab fume hoods, fall protection, roller window shades, P-lam lab casework, entrance floor mats, office furniture, canopy mounted PV system, machine room-less electric traction elevators, fire sprinklers, plumbing, HVAC, hydronic piping, electrical, communications, fire alarm, security, grading and paving, site utilities, sheeting/shoring/bracing, site concrete, pavers, chain link fencing, site furnishings, landscape, process integration, davit cranes, and common motor requirements for equipment. for the Project advertised as: WATER POLLUTION CONTROL FACILITY (WPCF) - ADMINISTRATION BUILDING (Project #612-07786) located at 3700 Enterprise Ave, Hayward, CA 94545. General Contractor bids are due to Owner on February 11, 2025, at 2:00 PM.

PLEASE NOTE: W.E. Lyons Construction Company request sub bids BEFORE 2:00 PM ON TUESDAY, FEBRUARY 11, 2025, to allow ample time for review. PLEASE SUBMIT PROPOSALS BY EMAIL TO: estimating@welyons.com.

Questions may be submitted to Bryan Dissman at (510) 719-1338 or email at: bdissman@welyons.com. Please click on above link to view Outreach Advertisement for more details.