Skip to main content
TitleARGONNE ELEMENTARY SCHOOL HVAC REPLACEMENT
Bid Date03/19/2025
Description

The Work consists of, but not limited to, the replacement of a rooftop-mounted HVAC unit of the Multi-Purpose Room at Argonne Elementary School. This project involves:
a) Removal of the existing rooftop-mounted HVAC unit and associated ductwork and its replacement with a new roof-mounted HVAC unit and associated ductwork, sheet metal flashings, and roof curbs.
b) Testing, adjusting & balancing of HVAC unit.
c) Reconnection of existing Distech controls and control panel to the existing SFUSD Energy Management System.
d) Miscellaneous work such as rough carpentry, roof repair, cement plaster repair, painting, and plumbing & electrical work.
e) There is NO hazardous materials abatement work in the project.

Estimated Construction Value: $250,000

Upload Ads
Click link to view image:Argonne-ES-HVAC-Replacement-12365_03-05-25.pdf
ContractorMarina Mechanical Services
Description

MARINA MECHANICAL SERVICES, as a "PRIME", is requesting quotations on "ALL TRADES" from all qualified Subcontractors and Suppliers, including certified DVBE/LBE/DBE/SBE/MBE/WBE firms for the Project advertised as: ARGONNE ELEMENTARY SCHOOL HVAC REPLACEMENT (SFUSD Project #12365) located at 680 18th St., San Francisco, CA 94121. Prime Contractor bids are due to Owner on March 19, 2025, at 2:00 PM.

PLEASE NOTE: Marina Mechanical Services requests sub bids BEFORE 2:00 PM ON WEDNESDAY, MARCH 19, 2025, to allow ample time for review.

Proposals should be submitted by email at: wwallace@marinam.com, or fax to (925) 294-9238.

Questions may be submitted to William Wallace at (510) 614-3500. Please click on above link to view Outreach Advertisement for more details.

Marina Mechanical Services is a signatory to Sheet Metal, Pipe Fitter, and Plumbers Unions

Click link to view image:Argonne-ES-HVAC-12365_03-05-25.pdf
ContractorACCO Engineered Systems
Description

ACCO ENGINEERED SYSTEMS is seeking qualified Subcontractors and Suppliers and/or certified DVBE/MBE/WBE/SBE/DBE/LBE firms for the Project advertised as: ARGONNE ELEMENTARY SCHOOL HVAC REPLACEMENT (SFUSD Project #12365) located at 680 18th St., San Francisco, CA 94121. Prime Contractor bids are due to Owner on March 19, 2025, at 2:00 PM.

PLEASE NOTE: ACCO Engineered Systems requests Subcontractor and Supplier bids by 3:00 PM ON TUESDAY, MARCH 18, 2025, to allow ample time for review.

Trades Needed Include: Low Voltage Controls, Rigging, Special Inspections, and Demolition. Bid Bonds may be required. Certified Payroll via Elation Software is required ($500/mo. per contractor to be included in base bid).

PLEASE SUBMIT ALL BID PROPOSALS BY EMAIL TO: Kenny Shin, Project Manager, at: kshin@accoes.com. Proposals may also be faxed to: (415) 399-1278.

Questions should be directed to Kenny Shin at (510) 330-6688 (cell).

Please click on above link to view Outreach Advertisement for more details.