Title | SAN FRANCISCO INTERNATIONAL AIRPORT LONG TERM PARKING GARAGE NO. 2 PROJECT |
---|---|
Bid Date | 06/01/2016 |
Description | The proposed LTPG2 is a 6-story parking structure which will be located northwest of the existing Long Term Parking Garage 1 (LTPG1) on Lot DD, at the northwest corner of Lot DD adjacent to the intersection of South Airport Boulevard and Highway 380. The total square footage of the new facility is approximately 1,500,000 square feet. Nibbi Brothers is currently prequalifying subcontractors for the Early Site Demolition, Site Preparation, Mass Grading, Early Utilities, and Deep Foundations trade packages. See posted Advertisement for package pre-qualification dates. |
Upload Ads | |
Click link to view image: | SFO-Long-Term-Parking-Garage-No.-2-2C-2D-3A-5-11-161.pdf |
Contractor | Nibbi Brothers |
Description | Nibbi Brothers has been selected as the General Contractor for the new Long Term Parking Garage No. 2 (LTPG2) Project at SFO. The proposed LTPG2 is a 6-story parking structure which will be located northwest of the existing Long Term Parking Garage 1 (LTPG1) on Lot DD, at the northwest corner of Lot DD adjacent to the intersection of South Airport Boulevard and Highway 380. The total square footage of the new facility is approximately 1,500,000 square feet. They are currently prequalifying subcontractors for the Early Site Demolition, Site Preparation, Mass Grading, Early Utilities, and Deep Foundations trade packages. PRE-QUALIFICATION DUE DATES: To obtain bid documents, please contact Mabel Ouyang by email at: mabelo@nibbi.com or call (415) 863-1820, ext. 120. For specific questions regarding this project, please contact Michael Dorsa, Project Manager, at: michaeld@nibbi.com or call (408) 623-4212 Click on link to open Advertisement for more full details. |